smaple.tr
Product & Process

Software Support SLA: Priorities, Response Times, Uptime and Credits

Mehmet Kurtipek
March 3, 2026
14 min read
Product & Process
SLA
Software maintenance
Incident management
Uptime

A software support SLA is the part of a support or maintenance contract that turns "we'll look after it" into numbers. It defines how problems are classified (usually P1 to P4), how fast the vendor must respond to and resolve each class, during which hours, and what the customer gets when a target is missed. If the vendor also runs the hosting, it adds a monthly availability target. A good one fits on two pages, and most of its value sits in the definitions: what counts as down, when the clock starts, and who decides.

What a support SLA covers

Most support SLAs have the same parts. Leave one out and it tends to come back during the first outage as an argument.

  1. Scope: which systems, environments and integrations are covered. Production only, or staging too? The mobile apps as well as the web app?
  2. Priority definitions: what makes a ticket P1, P2, P3 or P4, and who decides.
  3. Response and resolution targets for each priority.
  4. Support hours, channels and time zone.
  5. An availability target, if the vendor hosts the software.
  6. Measurement and reporting: where the numbers come from and how often you see them.
  7. Remedies and exclusions: service credits, termination rights, and what doesn't count.
  8. Customer obligations: named contacts, access to systems, steps to reproduce, someone who tests the fix.
  9. Security incidents: how fast the vendor tells you about a suspected breach.

The ninth is easy to forget in a small contract. It gets its own section below.

Define priorities by impact

A priority should describe what users can't do and whether there is a workaround. It shouldn't depend on how long the problem has lasted. A rule like "P1: outage of more than 30 minutes" means nobody can open a P1 during the first half hour of an outage, which is exactly when a fast response matters most.

Definitions we would start from for a business application:

  • P1, critical: production is down, or a core function (signing in, taking a payment, publishing a schedule) is unusable for most users and there is no workaround. A suspected security incident or data loss is always P1.
  • P2, high: a core function is broken or badly degraded for a group of users, or a workaround exists but costs real effort every day.
  • P3, normal: a bug in a secondary feature, or one that affects a single user, with a workaround.
  • P4, low: questions, cosmetic issues and feature requests.

Write down who sets the priority. GitHub's Premium Support documentation says the response time "begins when GitHub Premium Support sets the priority level of the ticket", and its priority guidelines give GitHub sole discretion to change a ticket's priority at any time. That is reasonable for a company with a large support organization. With a smaller supplier we prefer that the customer sets the priority when opening the ticket and the vendor can lower it only with a written reason, so nobody can quietly move the clock.

Response time and resolution time

Response time is how long it takes for a person who can work on the problem to acknowledge it and say what happens next. An automatic "we've received your ticket" email doesn't count. GitHub's page puts it plainly: "A response does not mean the issue has been resolved."

Resolution is harder to promise, because nobody can guarantee how long a bug takes to find. The version that works is a target for restoring service or providing a workaround on P1 and P2, with the permanent fix scheduled separately, usually in a release. Also say whether the clock pauses while the vendor waits for the customer: logs, access, a test account, confirmation that the fix works. Most ticketing tools have a pause state for exactly this. Without it, a target can be missed because the one person who can reproduce the bug is on holiday.

For a sense of scale, GitHub's paid Premium Support for enterprise customers promises a first response within 30 minutes for urgent tickets and 4 hours for high ones, around the clock, with a support engineer paged for urgent cases. Here is a starting point for a business application supported by one vendor team:

Priority

First response

Restore or workaround

Permanent fix

Hours

P1

1 hour

4 hours, with an update every hour

Next release, plus a root-cause note within 5 business days

24/7

P2

4 business hours

2 business days

Next scheduled release

Business hours

P3

1 business day

No target

Within the agreed release cycle

Business hours

P4

2 business days

No target

Backlog

Business hours

The right numbers come from what an hour of each kind of problem costs the business. Support gets expensive quickly as targets shrink, so don't pay for a 15-minute P3 response that nobody needs.

Support hours, holidays and time zones

"Business hours" needs a time zone, a list of working days and a holiday calendar. Turkey stays on UTC+3 all year while New York changes its clocks, so if both sides work 9 to 6, a team in Ankara and a client in New York overlap by one hour a day in winter and two in summer. A "4 business hours" response can then mean the same afternoon for one side and the next morning for the other. Write the hours in both time zones if you have to, but write them down.

Round-the-clock cover is a staffing decision more than a clause. Answering a P1 within an hour at 3 a.m. takes an on-call rota of several people who have production access and have agreed to be woken up. If a small vendor offers 24/7 support at no extra cost, ask who is on call this weekend. Plenty of business applications do well with 24/7 cover for P1 only and business hours for everything else.

Availability: promise only what you control

If the vendor hosts the software, the SLA usually includes a monthly availability target. The percentages hide how little room some of them leave:

Availability

Downtime allowed in a 30-day month

In a year

99%

7 h 12 min

3 days 15 h 36 min

99.5%

3 h 36 min

43 h 48 min

99.9%

43 min

8 h 46 min

99.95%

22 min

4 h 23 min

99.99%

4 min 19 s

52 min 34 s

Three terms from Google's SRE book keep this straight. A service level indicator (SLI) is the measurement, such as the share of requests that succeed. A service level objective (SLO) is the target for that measurement. An SLA is the agreement that attaches consequences to meeting or missing those targets; if nothing happens when a target is missed, what you have is an SLO. Your error budget is 100% minus the SLO: at 99.9%, about 43 minutes a month, shared by releases, migrations and incidents.

The same book recommends a safety margin: run a tighter SLO internally than the one you promise. We find it easiest to size that margin in minutes. A contract at 99.5% allows 3 h 36 min a month, so aim internally for 99.75%, which is half of that allowance.

Your availability also can't be higher than your dependencies allow. AWS commits to 99.5% for a single EC2 instance, and to 99.99% at region level only when instances run in two or more availability zones. An application on one instance that also needs a payment API promising 99.9% has a ceiling of about 99.4% (0.995 × 0.999) before any of its own bugs count. Microsoft's guide to reading SLAs warns that this multiplication gives only an approximate upper limit, because it assumes failures are independent and ignores each SLA's exclusions. Treat it as a check against overpromising; it proves nothing about the real number.

Dependencies include APIs you don't host. The field-ticket automation we built with an agency partner for an oilfield services company runs every evening and handles about 100 documents a day. Most of its failures were LLM API rate limits (HTTP 429). We added fallback routes to alternative models, so a ticket still gets processed when one model is throttled. A provider's rate limit is part of your service level whether the contract mentions it or not.

Two more things to settle: how availability is measured and what is excluded. An external monitor that checks every minute from more than one location, with results both sides can see, ends arguments that the vendor's own logs can't. Planned maintenance is normally excluded when it is announced in advance. Put limits on it, such as 48 hours' notice, outside business hours and no more than four hours a month.

Service credits and what a breach means

Keep incident communication and SLA breach apart. During an incident, the vendor posts updates at the agreed interval. A monthly availability SLA is breached only when the month closes below target, which can be weeks after the incident.

Credits are the usual remedy, and cloud providers tier them. On EC2, AWS credits 10% of the monthly charge when uptime falls below the commitment, 30% below 99.0% and 100% below 95.0%. A similar schedule for a hosted business application with a 99.5% target:

  • Below 99.5% but at least 99.0%: 10% of that month's fee.
  • Below 99.0% but at least 95.0%: 25%.
  • Below 95.0%: 50%, and the customer may end the contract without penalty.

Know the limits before relying on credits. Microsoft points out that providers usually don't apply credits on their own: the customer has to detect the breach, document it and file a claim on time (AWS wants the claim by the end of the second billing cycle after the incident). And credits "don't cover lost revenue, customer attrition, or reputational damage." In a support contract, the right to terminate after repeated misses, for example three missed P1 response targets in a quarter, usually protects the customer better than 10% of a monthly fee. If you are the vendor, apply credits automatically on the next invoice. It costs little and shows you track your own numbers.

Exclusions belong in writing too: planned maintenance as defined above, problems caused by the customer's own changes or by third parties the customer chose, force majeure, and features marked as beta. Name your own dependencies (hosting, payment provider, email delivery) instead of hiding them under "third parties", and say what you still owe when one of them fails. Oplist, a client we build for, gets staff and leave data from private hospitals' HR and payroll systems over live API integrations. Nobody on the rostering side can fix those systems when they stop answering. An SLA can't promise that someone else's system will be up or correct. What it can promise is what the vendor does when it isn't: notice, retry, and tell the customer which data is missing.

Security incidents and personal data

If the vendor processes personal data for you, the SLA or the data processing agreement next to it needs a notification deadline. Under the GDPR, the controller must notify the supervisory authority within 72 hours of becoming aware of a breach, and the processor must tell the controller "without undue delay" (Article 33). "Without undue delay" is hard to hold anyone to, so put a number in the contract, such as 24 hours from when the vendor becomes aware. That leaves the controller time to investigate and file. A suspected breach should also be P1 by definition, and the vendor's incident response process should say who makes that call at night.

Our two-day SLA

The SLA figures we can publish come from two long-running data engagements. With Method Procurement (catalog data automation, since 2019) and FrontRunner Professional (funeral-home data migrations, more than 250 tracked jobs), our SLA is two days.

That looks slow next to the table above, and it suits the work. Method Procurement's catalog depends on more than 20 supplier data files a month that have to land accurately and on schedule. FrontRunner's work is migration jobs tied to a funeral home's launch date, each tracked as a ticket, checked, and re-run or fixed during the launch when needed. Nobody is sitting in front of a broken login screen. A 30-minute response target would mostly pay for an on-call rota with nothing to do. What these clients need from the SLA is predictability. In a verified review on Clutch (January 2026), Method Procurement's CTO, William Doyle, wrote: "We were impressed by their consistency."

The rule we take from this: match the clock to the work. Software that people use at a counter or on a hospital ward needs response times in minutes or hours. Batch data, reports and internal tools can live with days, and the money is better spent on monitoring that catches problems before anyone opens a ticket.

A sample SLA to adapt

These clauses cover the engineering side of a support SLA. Change the numbers to fit your case, and have a lawyer read the result before anyone signs it.

  1. Coverage: the production web application, its API, and the iOS and Android apps. Staging is supported on a best-effort basis.
  2. Priorities: P1 to P4 as defined in Schedule A. The customer sets the priority when opening a ticket; the provider may lower it only with a written reason.
  3. Channels and hours: tickets through the support portal or the support email address, and P1 also by phone. Business hours are 09:00 to 18:00 UTC+3, Monday to Friday, excluding the public holidays listed in Schedule B. P1 is covered 24/7.
  4. Targets: first response and restore times as in the table above. The clock pauses while the provider waits for information or access it has requested from the customer.
  5. Availability: 99.5% per calendar month, measured by an external monitor that checks every minute from at least two regions. Planned maintenance announced 48 hours ahead, carried out outside business hours and totaling no more than four hours a month is excluded.
  6. Credits: as in the schedule above, applied automatically to the next invoice. The customer may terminate without penalty after three missed P1 response targets in one calendar quarter.
  7. Security: the provider notifies the customer of a suspected personal data breach within 24 hours of becoming aware of it.
  8. Reporting: a monthly report with ticket counts by priority, targets met and missed, measured availability, and a root-cause note for every P1.
  9. Review: both parties review this SLA every six months.

Frequently asked questions

What is a reasonable P1 response time?

Large vendors with paged support teams offer 30 minutes; GitHub Premium Support does. For a business application looked after by one vendor team, one hour around the clock is realistic, provided someone is actually on call. Ask to see the rota.

Is 99.9% uptime good enough?

It allows about 43 minutes of downtime in a 30-day month, which one bad deployment or a long database migration can use up. For an application on single-region hosting run by a small team, 99.5% is often the more honest promise.

Does a support SLA cover new features?

Usually not. Bugs are handled under the priorities, while new features and changes go through a separate change request with their own estimate. Put that sentence in the contract so a feature request filed as P2 doesn't start the clock.

If you want a second pair of eyes on an SLA before you sign it, or a team to support software that is already in production, our maintenance and support page explains how we work.

Related Articles

May 17, 2026

WMS vs TMS: What Each Does and Which One You Need First

A WMS runs what happens inside the warehouse; a TMS runs what happens after the truck leaves. Where they meet, which to buy first, and when you need neither.

Read More: WMS vs TMS: What Each Does and Which One You Need First
April 3, 2026

SaaS Pricing Models: How to Choose One and Bill for It

The main SaaS pricing models, when each one fits, and the decision to make first: your value metric. Plus what your pricing asks of the billing code.

Read More: SaaS Pricing Models: How to Choose One and Bill for It
April 2, 2026

SaaS Metrics: What to Track, How to Calculate It, What Good Looks Like

The core SaaS metrics with formulas and worked examples, what recent benchmarks say is normal, and the definition mistakes that quietly distort MRR, NRR and LTV.

Read More: SaaS Metrics: What to Track, How to Calculate It, What Good Looks Like